AMS Industrial Services Company personnel replaced raw water piping, generator air coolers, air conditioner coils, and water piping. Lead-based paint abatement was required along with the re-connection of mechanical equipment to existing electrical connections. We replaced piping for both units on this $1.5M project that uses two 56 MW turbines to generate over 6,000,000 MWh.

  • CATEGORY
  • STARTED
  • COMPLETED
  • OWNER
  • LOCATION
  • Piping
  • May, 2015
  • April, 2017
  • Army Corps of Engineers
  • Eureka Springs, Arkansas