Beaver Dam Powerhouse Piping Replacement
AMS Industrial Services Company personnel replaced raw water piping, generator air coolers, air conditioner coils, and water piping. Lead-based paint abatement was required along with the re-connection of mechanical equipment to existing electrical connections. We replaced piping for both units on this $1.5M project that uses two 56 MW turbines to generate over 6,000,000 MWh.
- CATEGORY
- STARTED
- COMPLETED
- OWNER
- LOCATION
- Piping
- May, 2015
- April, 2017
- Army Corps of Engineers
- Eureka Springs, Arkansas