AMS will replace units 1-3 generator air coolers 3 9” raw water strainers and stainless-steel piping and valves. For units 1-2, work also includes design of pipe and supports for the raw water and air cooler piping demolition and removal, and replacing the thrust bearing oil coolers.
American Mine Services
11808 Highway 93
Boulder, Colorado 80303