

AMS Industrial Services Company personnel rehabilitated a 38’ x 48’ tainter gate trunnion hub assembly at John Redmond Dam for the USACE. Work involved using a crane from the top of the dam to lower scaffolding and installing a steel beam to hold the lifted gate.
American Mine Services
11808 Highway 93
Boulder, Colorado 80303