Ozark Powerhouse Treated Water Plant Rehabilitation

AMS Industrial Services Company personnel completed this piping project that included demolishing the filters in the existing treated water plant with associated piping and controls. Pipe sizes varied from ¾” to 6” bronze, copper, and galvanized. Completing this project, a month ahead of schedule, we installed Turbo-Disc filter systems, connected electrical and controls, and performed system testing and training.

  • CATEGORY
  • STARTED
  • COMPLETED
  • OWNER
  • LOCATION
  • Piping
  • November, 2015
  • May, 2016
  • Army Corps of Engineers
  • Franklin County, Arkansas